Skip to main content
Electric Vehicle guide for retailers and logistics for driven moves
Retailers
- The retailer only has to pay for the wait time for charging an EV (Electric Vehicle) if it takes longer than 30 minutes.
- There must be enough charge in the vehicle to get to the nearest charging point. If not, the logistic company may abort the move.
Logistics
- When placing a bid on an EV make sure your bid is to cover the cost of charging the vehicle.
- You cannot abort the move if there is enough charge at the collection site to drive to the nearest charging point.
- If a vehicle is a hybrid, and the driver chooses to go electric, no wait time charges will be approved for the recharge.
- You can request the wait time by emailing the AT Moves team. Please include the retailer in the email.